(D) weak ability to control costs
(1) materials procurement aspects of the implementation of qualified sub-supplier evaluation system strictly, the material does not meet the engineering requirements, or to the large generation of small to cause material backlog and waste.
(2) materials, “Run, run, drip, leak serious limits picking system is not implemented, is not an accurate accounting of material consumption level.
(3) machinery and equipment utilization is low, work slowdown phenomenon.
Three enterprises in the construction cost of the project management and control
(A) focus on cost control efforts to reduce costs in the construction phase of the construction in progress
Adidas Smith Men Shoes – 36
1, in the process of built in accordance with the respective responsibilities of goals to do a good job of cost control and analysis
(1) to improve labor productivity, save money, strengthen the management of labor costs.
(2) streamline at the organs and bodies, Yajian sections of redundant staff and subsidiary organs of the unit’s staff, the working personnel of multi-skill. The number of project managers, according to the amount of investment size, technical complexity, the difficulty of construction and construction capacity to determine. Take the competition, other posts, a statutory role, and personnel, given the job risk coefficient;
Adidas Smith Men Shoes – 35
(3) the construction and production operations personnel training, in a timely manner to improve their production capacity and technical level, to enable them to complete and exceeded quotas of work to a minimum of labor consumption, to maximize the efficiency of labor;Knock off D&G Shoes,
(4) to strengthen the science and technology management learning and the introduction of advanced management methods, technical equipment, process, and to improve the man-machine work efficiency;
(5) According to the construction operations plan, the network processes make full use of the existing face, as far as possible the organization of parallel operations, to expand the face, and follow-up process to work in advance, to improve the man-hours to use the effect to minimize the slowdown, the phenomenon of . Knock off Columbia Shoes,(6) selected construction enterprises workers to choose the best contracting team of strong technical expertise, practical experience, fair competition, the establishment of mechanisms capable Yongzhe. Contracting team as little as possible employed, workers on the construction of their units online, play the greatest enthusiasm of the workers, and create a lot of money, benefits, and reduce the burden